Week 1
After Kickoff, the team met to discuss and decide on strategy. During Week 1, students prototyped many aspects of the robot including the drive train and manipulation systems. They assembled the robot frame and decided on an eight wheel tank drive. Some students also constructed a bridge to replicate that of the playing field.






